Pine Lake Corn Processors/Monsanto Ethanol – Steamboat Rock, Iowa
Category:Agriculture
This building is located on Highway 20 just north of Steamboat Rock, or 30 miles west of the Cedar Falls/Waterloo metro area.
Project Specifications
- Butler Pre-Engineered Building
- 34,000 sq. feet
- 4,000 sq. feet
King Construction was contracted to build a 34,000-square-foot pre-engineered Butler Building for use in the ethanol processing operation. The project included a 4,000-square-foot mezzanine along with pass-through overhead doors to accommodate the heavy truck traffic handling distillers’ grains for the local cattle feed mills.