Pine Lake Corn Processors/Monsanto Ethanol – Steamboat Rock, Iowa

Category: Agriculture

This building is located on Highway 20 just north of Steamboat Rock or 30 miles west of the Cedar Falls/Waterloo metro area.

Project Specifications

  • Butler Pre-Engineered Building 
  • 34,000 sq. feet
  • 4,000 sq. feet 
King Construction was contracted to build a 34,000 sq. ft. pre-engineered Butler Building for use in the ethanol processing operation. The project included a 4,000 sq. ft. mezzanine along with pass thru overhead doors to accommodate the heavy truck traffic handling distillers' grains for the local cattle feed mills.    
Image