Graybar – Cedar Rapids, Iowa

This building is located in the Eastern Iowa Airport Business Park.  

Project Specifications

  • 72,000 sq. feet
  • Pre-Engineered Butler Building 
  • 12 Month Construction Timeline
King was hired by a developer to construct a 72,000 square foot pre-engineered Butler building for the end user, Graybar Electric Supply for offices, retail and warehousing. The building integrated Butler widespan design along with their patented MR-24 Standing Seam Roof system.   
Image